Worship With Us!

8am & 10:30am Traditional
9:15am Contemporary

By the time you read this the last remaining areas of the church that haven’t been refreshed in the last 10 years will have a new coat of paint and more thanks to the generous support of the Memorial Gift Board and a generous donor in the congregation.

The women’s room outside the sanctuary was completely refurbished with new toilets and extended stalls, new sinks, countertops and cabinetry, mirrors, changing table, a club chair, and newly painted walls and lighting through the generous donation of one of our members. Additionally, the men’s room in the same area as well as all four of the first floor bathrooms received a new coat of paint and the bathrooms on the first floor all had new cabinets and sinks, mirrors and lighting installed. The Parish Hall has a fresh coat of paint and new flooring as well as the hallway outside the office by the elevator. In June the narthex wood floors were sanded and refinished in the summer. The kitchen also received a new coat of paint, as well as a new dishwasher and refrigerator all through the Memorial Gift Board support of the spendable funds made available from the Dunkle Endowment Fund. Many thanks to Peaches Larro and the Board for coordinating the entire project and for our Handymen’s Group for completing much of the bathroom cabinetry, sink, mirror and toilet installation!